London City Airport: Difference between revisions

Jump to navigation Jump to search
Line 52: Line 52:


==Facilities and Transportation==
==Facilities and Transportation==
In December 2005 the Docklands Light Railway (DLR) extension to the airport treminal opened.
In December 2005 the Docklands Light Railway (DLR) extension to the airport terminal opened.